BTC
·
ETH
·
BTC Hashrate:
HomeAboutWhy Coinfast
Services
Miner HostingNatural Gas MiningAI Data CenterMiner RepairCloud MiningFarm ConstructionCrypto SettlementsLocationsFAQNewsContact
Get a Quote

Bitcoin Miner Hosting

Institutional-grade ASIC colocation across 4 countries.

$0
Setup Fee (350+ miners)
99%
Uptime SLA
1 MW
Minimum Capacity
24/7
On-site Support

Hosting Service

Deploy your fleet with zero friction.

Coinfast offers full-service ASIC miner hosting at facilities across the UAE, Russia, Paraguay, and the United States. All facilities operate on 240V grid power with 99% uptime backed by contractual SLA.

Hosting Requirements

  • Minimum 1 MW hosting capacity per client.
  • Miners must draw 2.8KW or more.
  • Valid legal import documentation required.
  • 240V grid power supported as standard.
  • Minimum 1-year contract term.
  • One month electricity deposit required at contract signing.

Pricing

  • Zero setup fee for deployments of 350 or more miners.
  • For fewer than 350 miners: $50 per miner one-time setup fee.
  • Monthly billing based on actual electricity consumption plus 2% loss allowance.
  • Repair and replacement costs billed separately and transparently.

Why host your miners with Coinfast?

Hosting ASIC miners with a professional facility operator eliminates the largest operational risks of self-mining: unstable power, inadequate cooling, customs complications, and downtime losses. Coinfast operates 500MW of institutional-grade capacity across the UAE, Russia, Paraguay, and the United States — giving clients true geographic diversification within a single hosting contract.

Every facility runs on 240V infrastructure with a contractually guaranteed 99% uptime SLA, on-site certified repair technicians, and 24/7 monitoring. Clients receive transparent monthly electricity billing based on actual consumption, with full remote access to miner dashboards for real-time hashrate and temperature monitoring.

Which miners are supported?

Coinfast facilities support all major ASIC brands including Bitmain Antminer (S19, S21 series), MicroBT Whatsminer (M50, M60 series), and Canaan Avalon. Both air-cooled and hydro-cooled machines are accepted, with dedicated hydro infrastructure at our 45MW Russian facility. Minimum power draw per machine is 2.8kW with valid import documentation.

Coinfast Bitcoin mining facility Kazan Russia 200MW natural gas power

Supported Locations

Choose your jurisdiction.

Coinfast headquarters Dubai Business Bay UAE VARA regulated
HQ
Dubai, UAE
Regulated
Business Hub
Coinfast Bitcoin mining facility Kazan Russia 200MW natural gas power
Natural Gas
Russia (Komi)
Lowest Power
Cost Option
Coinfast Paraguay hydroelectric Bitcoin mining facility
Renewable
Paraguay
Hydro Power
Available
Coinfast North America mining facility overview
Operational
United States
North America
Hub
Get a Hosting Quote

Related Articles

2025 Profitability Analysis Hosting vs Cloud vs Self-Build Institutional Mining Guide
WhatsApp Telegram